About AVD Metal Tech – Powering Hindustan Petroleum
AVD Metal Tech is a trusted leader in precision metal fabrication and engineering solutions, proudly building the state-of-the-art **Biostation** infrastructure for Hindustan Petroleum Corporation Limited (HPCL) and other leading green energy initiatives across India.
With deep expertise in stainless steel structures, corrosion-resistant dispensing units, safety-compliant canopies, and modular biofuel stations, we have successfully delivered turnkey Biostation projects compatible with ethanol blends (E10–E20 and higher), biodiesel, Compressed Bio-Gas (CBG), and integrated EV charging systems under HP e-Charge. Our fabrications meet stringent HPCL standards — ensuring durability, leak-proof performance, and long-term reliability in high-traffic retail environments.
By combining advanced CNC fabrication, high-grade materials, and rigorous quality control, AVD Metal Tech enables Hindustan Petroleum to deploy modern, eco-friendly fuel stations that support the Ethanol Blending Programme, SATAT initiative for CBG, waste-to-energy principles, comply with advanced emission norms, and accelerate India's journey toward energy independence, reduced import dependency, and a cleaner planet.
Partner with AVD Metal Tech — the backbone behind Hindustan Petroleum's growing network of sustainable biofuel, CBG dispensing, and green energy infrastructure, including E20/E+ blending outlets and EV-integrated forecourts.
Precision Fabrication Excellence
State-of-the-art CNC bending, laser cutting & welding for HPCL Biostation canopies, dispensers, and structural frames — engineered for 15+ years of durability in demanding outdoor retail environments.
Safety & Compliance First
Fully compliant with PESO, OISD, and relevant safety standards — using premium corrosion-resistant SS304/SS316, leak-proof joints, and fire-safe designs tailored for HPCL's biofuel, CBG, and EV-integrated dispensing stations.
Enabling HPCL's Green Energy Transition
Trusted fabrication partner for Hindustan Petroleum — delivering modular, scalable Biostations that support E20 ethanol blending, biodiesel, Compressed Bio-Gas (CBG) under SATAT, and fast EV charging (HP e-Charge) to drive India's sustainable fuel and mobility future.
Complete Project Journey – Start to Finish
1. Site Survey & Planning
Month 1
Topographical & soil testing, traffic study, eco-feasibility, layout design & DPR preparation.
2. Regulatory Approvals & LOI
Months 2–3
PESO NOC, Fire, Pollution Board, Oil Company approvals & Letter of Intent (LOI).
3. Civil & Foundation Works
Month 4
Excavation, RCC foundations, underground trenches & initial civil construction.
4. Structural Fabrication & Erection
Month 5
MS/steel canopy fabrication, painting & erection by AVD Metal Tech experts.
5. Tankage & Piping Installation
Month 6
Double-wall tanks, piping, earthing & leak detection systems installed.
6. Dispensing & Green Tech Setup
Month 7
Dispensers, EV chargers, solar integration, lighting & fire systems.
7. Finishing, Branding & IT Integration
Month 8
Branding, signage, landscaping, digital systems & final finishing.
8. Final Testing & Inauguration
Month 9 – Delivered!
Inspections, certifications, launch & handover to satisfied clients.
Total Timeline: ~9 Months per Project | Proven Track Record by AVD Metal Tech
Why Choose AVD Metal Tech?
Proven builder of branded stations: HPCL, BPCL, Bharat EcoFuels & more.
Precision Fabrication
Sustainable Designs
On-Time Delivery
Quality & Compliance
Featured Project Locations
High-traffic sites across India – e.g., highway corridors & urban edges
Strategic locations like NH corridors – adaptable to your site.
What Our Awesome Clients Say About Us
Ankita Verma
AVD Metal Tech delivered our biofuel dispensing unit (Biostation) with exceptional precision and quality. Their fabrication work met all safety and durability standards required for HPCL outlets. Highly professional team!
Priya Singh
The Biostation fabricated by AVD Metal Tech for our Bharat Eco Fuel initiative has been performing flawlessly. Excellent welding, corrosion-resistant finish, and on-time delivery. A trusted partner for critical infrastructure.
Rohit Sharma
We are extremely satisfied with the stainless steel Biostation structure supplied by AVD Metal Tech. Robust design, perfect dimensional accuracy, and quick response to custom requirements. Recommended!
Sanya Mehta
Exceptional guidance throughout the entire process. The team was responsive, knowledgeable, and made complex procedures feel effortless. Truly outstanding service!
Ready to Build Your Fuel Station?
Turnkey solutions for HPCL, BPCL, eco-brands & custom projects.
Frequently Asked Questions
• Medium ethanol plant (100–200 KLPD): 18–30 months
• Large integrated biorefinery: 24–42 months
Timelines vary depending on approvals, land availability, and financing.