About AVD Metal Tech – Powering Hindustan Petroleum

AVD Metal Tech is a trusted leader in precision metal fabrication and engineering solutions, proudly building the state-of-the-art **Biostation** infrastructure for Hindustan Petroleum Corporation Limited (HPCL) and other leading green energy initiatives across India.

With deep expertise in stainless steel structures, corrosion-resistant dispensing units, safety-compliant canopies, and modular biofuel stations, we have successfully delivered turnkey Biostation projects compatible with ethanol blends (E10–E20 and higher), biodiesel, Compressed Bio-Gas (CBG), and integrated EV charging systems under HP e-Charge. Our fabrications meet stringent HPCL standards — ensuring durability, leak-proof performance, and long-term reliability in high-traffic retail environments.

By combining advanced CNC fabrication, high-grade materials, and rigorous quality control, AVD Metal Tech enables Hindustan Petroleum to deploy modern, eco-friendly fuel stations that support the Ethanol Blending Programme, SATAT initiative for CBG, waste-to-energy principles, comply with advanced emission norms, and accelerate India's journey toward energy independence, reduced import dependency, and a cleaner planet.

Partner with AVD Metal Tech — the backbone behind Hindustan Petroleum's growing network of sustainable biofuel, CBG dispensing, and green energy infrastructure, including E20/E+ blending outlets and EV-integrated forecourts.

AVD Metal Tech Biostation for Hindustan Petroleum - Sustainable Fuel Dispensing
Precision Fabrication Excellence

State-of-the-art CNC bending, laser cutting & welding for HPCL Biostation canopies, dispensers, and structural frames — engineered for 15+ years of durability in demanding outdoor retail environments.

Safety & Compliance First

Fully compliant with PESO, OISD, and relevant safety standards — using premium corrosion-resistant SS304/SS316, leak-proof joints, and fire-safe designs tailored for HPCL's biofuel, CBG, and EV-integrated dispensing stations.

Enabling HPCL's Green Energy Transition

Trusted fabrication partner for Hindustan Petroleum — delivering modular, scalable Biostations that support E20 ethanol blending, biodiesel, Compressed Bio-Gas (CBG) under SATAT, and fast EV charging (HP e-Charge) to drive India's sustainable fuel and mobility future.

Complete Project Journey – Start to Finish

1. Site Survey & Planning

Month 1

Topographical & soil testing, traffic study, eco-feasibility, layout design & DPR preparation.

2. Regulatory Approvals & LOI

Months 2–3

PESO NOC, Fire, Pollution Board, Oil Company approvals & Letter of Intent (LOI).

3. Civil & Foundation Works

Month 4

Excavation, RCC foundations, underground trenches & initial civil construction.

4. Structural Fabrication & Erection

Month 5

MS/steel canopy fabrication, painting & erection by AVD Metal Tech experts.

5. Tankage & Piping Installation

Month 6

Double-wall tanks, piping, earthing & leak detection systems installed.

6. Dispensing & Green Tech Setup

Month 7

Dispensers, EV chargers, solar integration, lighting & fire systems.

7. Finishing, Branding & IT Integration

Month 8

Branding, signage, landscaping, digital systems & final finishing.

8. Final Testing & Inauguration

Month 9 – Delivered!

Inspections, certifications, launch & handover to satisfied clients.

Total Timeline: ~9 Months per Project | Proven Track Record by AVD Metal Tech

Why Choose AVD Metal Tech?

Proven builder of branded stations: HPCL, BPCL, Bharat EcoFuels & more.

Precision Fabrication
Sustainable Designs
On-Time Delivery
Quality & Compliance

Our Gallery

Showcasing our ongoing and completed biofuel, bio-CNG, ethanol, and sustainable energy projects across India.

  • All
  • Complete
  • Construction
  • Day
  • Night

Complete 1

Construction 1

Day 1

Night 1

Complete 2

Construction 2

Day 2

Complete 3

Construction 3

Construction 4

Featured Project Locations

High-traffic sites across India – e.g., highway corridors & urban edges

Strategic locations like NH corridors – adaptable to your site.

What Our Awesome Clients Say About Us

Ready to Build Your Fuel Station?

Turnkey solutions for HPCL, BPCL, eco-brands & custom projects.

Call Now

Frequently Asked Questions

We specialize in 1G & 2G ethanol plants, bio-CNG (CBG) production facilities, biodiesel plants, biogas upgrading systems, and integrated biorefineries using agricultural residues, municipal waste, and industrial effluents.

Yes. We offer complete turnkey services including feasibility study, DPR preparation, government approvals & subsidies handling, detailed engineering, procurement, construction, commissioning, and post-commissioning support.

Major schemes include: SATAT (for CBG), Ethanol Blended Petrol Programme (EBP), PMKSY, GOBARdhan scheme, National Bioenergy Programme, and state-level incentives. We assist clients in availing these benefits.

• Small CBG plant (5–10 TPD): 12–18 months
• Medium ethanol plant (100–200 KLPD): 18–30 months
• Large integrated biorefinery: 24–42 months
Timelines vary depending on approvals, land availability, and financing.

Yes. We provide 1–5 year Annual Maintenance Contracts (AMC), remote monitoring support, operator training, performance optimization, and spare parts supply.
WhatsApp