About AVD Metal Tech – Powering Bharat Eco Fuel

AVD Metal Tech is a trusted leader in precision metal fabrication and engineering solutions, proudly building the state-of-the-art **Biostation** infrastructure for Bharat Eco Fuel and other leading green energy initiatives across India.

With deep expertise in stainless steel structures, corrosion-resistant dispensing units, safety-compliant canopies, and modular biofuel stations, we have successfully delivered turnkey Biostation projects compatible with biodiesel (B10–B20), ethanol blends (E10–E20), bio-CNG, and integrated EV charging systems. Our fabrications meet stringent standards for HPCL, BPCL, Bharat Eco Fuel, and similar eco-brands — ensuring durability, leak-proof performance, and long-term reliability in high-traffic retail environments.

By combining advanced CNC fabrication, high-grade materials, and rigorous quality control, AVD Metal Tech enables Bharat Eco Fuel to deploy modern, eco-friendly fuel stations that reduce emissions, support waste-to-energy principles, comply with Euro VI norms, and accelerate India's journey toward energy independence and a cleaner planet.

Partner with AVD Metal Tech — the backbone behind India's growing network of sustainable biofuel & green energy dispensing infrastructure.

AVD Metal Tech Biostation for Bharat Eco Fuel - Sustainable Fuel Dispensing
Precision Fabrication Excellence

State-of-the-art CNC bending, laser cutting & welding for Biostation canopies, dispensers, and structural frames — built to last 15+ years in harsh outdoor conditions.

Safety & Compliance First

Fully compliant with PESO, OISD, and ATEX-equivalent standards — corrosion-resistant SS304/SS316 construction, leak-proof joints, and fire-safe design for biofuel & EV-integrated stations.

Enabling Green Energy Transition

Trusted partner for HPCL, BPCL & Bharat Eco Fuel — delivering modular, scalable Biostations that support biodiesel, ethanol, bio-CNG, and fast EV charging for a sustainable tomorrow.

Complete Project Journey – Start to Finish

1. Site Survey & Planning

Month 1

Topographical & soil testing, traffic study, eco-feasibility, layout design & DPR preparation.

2. Regulatory Approvals & LOI

Months 2–3

PESO NOC, Fire, Pollution Board, Oil Company approvals & Letter of Intent (LOI).

3. Civil & Foundation Works

Month 4

Excavation, RCC foundations, underground trenches & initial civil construction.

4. Structural Fabrication & Erection

Month 5

MS/steel canopy fabrication, painting & erection by AVD Metal Tech experts.

5. Tankage & Piping Installation

Month 6

Double-wall tanks, piping, earthing & leak detection systems installed.

6. Dispensing & Green Tech Setup

Month 7

Dispensers, EV chargers, solar integration, lighting & fire systems.

7. Finishing, Branding & IT Integration

Month 8

Branding, signage, landscaping, digital systems & final finishing.

8. Final Testing & Inauguration

Month 9 – Delivered!

Inspections, certifications, launch & handover to satisfied clients.

Total Timeline: ~9 Months per Project | Proven Track Record by AVD Metal Tech

Why Choose AVD Metal Tech?

Proven builder of branded stations: HPCL, BPCL, Bharat EcoFuels & more.

Precision Fabrication
Sustainable Designs
On-Time Delivery
Quality & Compliance

Our Gallery

Showcasing our ongoing and completed biofuel, bio-CNG, ethanol, and sustainable energy projects across India.

  • All
  • Complete
  • Construction
  • Day
  • Night

Complete 1

Construction 1

Day 1

Night 1

Lorem ipsum, dolor sit amet consectetur

Complete 1

Construction 2

Day 2

Night 2

Complete 1

Construction 3

Night 3

Construction 4

Night 4

Featured Project Locations

High-traffic sites across India – e.g., highway corridors & urban edges

Strategic locations like NH corridors – adaptable to your site.

What Our Awesome Clients Say About Us

Ready to Build Your Fuel Station?

Turnkey solutions for HPCL, BPCL, eco-brands & custom projects.

Call Now

Frequently Asked Questions

We specialize in 1G & 2G ethanol plants, bio-CNG (CBG) production facilities, biodiesel plants, biogas upgrading systems, and integrated biorefineries using agricultural residues, municipal waste, and industrial effluents.

Yes. We offer complete turnkey services including feasibility study, DPR preparation, government approvals & subsidies handling, detailed engineering, procurement, construction, commissioning, and post-commissioning support.

Major schemes include: SATAT (for CBG), Ethanol Blended Petrol Programme (EBP), PMKSY, GOBARdhan scheme, National Bioenergy Programme, and state-level incentives. We assist clients in availing these benefits.

• Small CBG plant (5–10 TPD): 12–18 months
• Medium ethanol plant (100–200 KLPD): 18–30 months
• Large integrated biorefinery: 24–42 months
Timelines vary depending on approvals, land availability, and financing.

Yes. We provide 1–5 year Annual Maintenance Contracts (AMC), remote monitoring support, operator training, performance optimization, and spare parts supply.
WhatsApp